Seamless pipes are widely used in production and life. In recent years, the development of seamless pipes has shown a good trend. For the manufacture of seamless pipes, it is also to ensures its high-quality processing and production. CBIES AUTOMOTIVE is a professional auto parts export enterprise. Seamless pipes are commonly used. CBIES mainly applies them to side door anti-collision bars and shock absorbers. CBIES has been deeply cultivated for decades and has been well-received by many manufacturers. Here is a brief introduction to the production process of seamless pipes. For everyone to learn and reference
The manufacturing process of seamless steel pipe is mainly divided into two steps:
A. Hot-rolled seamless steel pipe: round tube billet → heating → piercing → three-roll cross rolling, continuous rolling or extrusion → stripping → sizing (or reducing) → cooling → straightening → hydraulic test (or flaw detection) →Marking→Storage
The raw material for rolling seamless pipes is a round tube billet, and the round tube embryo should be cut into a long billet about 1 meter long by a cutting machine, and transported to the furnace by a conveyor belt. The steel billet is sent into the furnace for heating, and the temperature is about 1200 degrees Celsius. The fuel is hydrogen or acetylene, and the temperature control in the furnace is a key issue.
After the round tube is out of the furnace, it must be pierced by a pressure piercer. Generally, the more common piercing machine is the cone roll piercing machine. This kind of piercing machine has high production efficiency, good product quality, large piercing diameter expansion, and can wear various steel types. The perforated round tube billet is successively passed through three-roll cross-rolling, continuous rolling, or extrusion. This is the step of seamless steel pipe shaping, which must be done carefully. After extrusion, the tube needs to be removed for sizing. The sizing is passed through a high-speed rotary conical drill into the billet to form the tube. The length of the outer diameter of the drill bit of the sizing machine determines the inner diameter of the steel pipe. After the steel pipe is sized, it enters the cooling tower and is sprayed with water for cooling. The steel pipe is straightened after cooling. After straightening, the steel pipe is sent to the metal flaw detector (or hydraulic test) by the conveyor belt for internal flaw detection. After the operation, if there are cracks, bubbles, and other problems inside the steel pipe, they will be detected.
After the steel pipes pass the quality inspection, strict manual selection is required. After the quality inspection of the steel pipe, paint the serial number, specification, production batch number, etc. with paint. And hoisted into the warehouse with a crane. It is necessary to ensure the quality of the seamless steel pipe and the operation of the detailed process.
B. Cold drew (rolled) seamless steel pipe: round tube blank→heating→piercing→heading→annealing→pickling→oiling (copper plating)→multi-pass cold drawing (cold rolling)→blank tube→heat treatment→straightening →Static pressure test (flaw detection)→Marking→Storage.
Among them, the rolling method of cold-drawn (rolled) seamless steel pipe is more complicated than that of hot rolling (extruded seamless steel pipe). The first three steps of their production process are basically the same. Therefore, it is easier to operate. The difference is that starting from the fourth step after the round tube blank is emptied, it needs to be annealed. After annealing, pickle with a special acidic liquid. After pickling, apply oil. Then multi-pass cold drawing (cold rolling) and special heat treatment. After heat treatment, it will be straightened. After straightening, the steel pipe is sent to the metal flaw detector (or hydraulic test) by the conveyor belt for internal flaw detection. If there are cracks, bubbles, and other problems inside the steel pipe, they will be detected.
After these processes are completed, the steel pipes have to undergo strict manual selection after quality inspection. After the quality inspection of the steel pipe, paint the serial number, specification, production batch number, etc. with paint. After completing all these works, they will be hoisted into the warehouse by crane.
The seamless steel pipes in storage should also be carefully preserved and scientifically maintained to ensure that high-quality seamless steel pipes leave the factory when they are sold.